Section 8

Section 8 Inspection Checklist for Las Vegas: What SNRHA Checks

After you find an apartment and submit your Request for Tenancy Approval, the unit has to pass a Section 8 inspection before your voucher can pay rent. In Las Vegas that inspection is done by the Southern Nevada Regional Housing Authority (SNRHA). Here is what the inspector checks, why units fail, and what happens if one does.

What standard SNRHA inspects against

SNRHA inspects voucher units against Housing Quality Standards (HQS), and publishes an HQS pre-inspection checklist for owners. HUD is replacing HQS with a new standard called NSPIRE, and housing authorities must switch the voucher program over by February 1, 2027 (HUD Notice PIH 2026-18). Until then they can keep using HQS. Smoke alarm and carbon monoxide rules already apply either way.

SNRHA’s checklist is clear that it is “not all-inclusive” and that if any item needs repair, the unit will fail.

The checklist, room by room

Based on SNRHA’s HQS Pre-Inspection Checklist, last updated March 19, 2026.

Every room

  • No exposed wiring. Outlet and switch covers present and not cracked, and three-prong outlets grounded.
  • Windows have glass, open and close properly, lock, and aren’t cracked or broken.
  • Exterior doors are weather stripped. Interior doors fit their openings and have handles.
  • Floors and walls are sound, with no holes, bowing, or hazardous defects.
  • No chipping, peeling, or cracking paint. Repairs are patched, sanded, and painted.
  • No tripping hazards over 3/8 inch, such as torn flooring or loose cords.
  • Carpet is free of rips and fraying. For a new contract it should be new or freshly shampooed.

Heating and air conditioning

  • Heat reaches every living room, and there are no unvented fuel-burning space heaters.
  • Window or wall AC units are sealed against air leaks and slanted to drain outside.
  • Vents and ductwork are in good condition.
  • A furnace in a closet has vented doors. A gas water heater or gas furnace can’t be in a bedroom closet.

Bathroom

  • Toilet works, is secured to the floor, doesn’t leak, and has a lid that fits.
  • Sink and tub or shower have hot and cold running water, enough pressure, and drain properly.
  • There is an exhaust fan vented outside or a window that opens.
  • Fixtures are secured, gaps around pipes are sealed, and there are no hazardous cracks in the tub or basin.

Kitchen

  • Appliances are clean and working. The stove has every knob, readable dials, and working burners and oven.
  • The refrigerator holds temperature, seals properly, and has its handles and drawers.
  • Cabinets, walls, and counters are clean, and there is room to store and prepare food.
  • The sink has hot and cold water, no leaks, and drains properly.

Water heater and laundry

  • No leaks or corroded pipes. The pressure relief valve doesn’t leak and its discharge pipe runs to about six inches from the floor.
  • Flame shields are in place, wiring is in conduit, and the flue is installed and sealed.
  • The dryer is vented and the laundry area is free of lint.

Safety items

  • A working smoke detector on each level of the unit.
  • A working carbon monoxide alarm where there are fuel-burning appliances or an attached garage.
  • Stairs have no loose or broken steps, and there is a secure handrail where there are four or more risers.
  • No mold, sewer, or gas odors, no leaks, no pests, and no built-up trash.
  • Water, gas, and electric are on, and utilities are separated so the tenant pays only their own.

Outside

  • Paint, foundation, siding, roof, and gutters are in good repair.
  • Walkways and driveways have no tripping hazards.
  • The address and unit number are posted and visible.
  • Every structure on the property is inspected, including sheds or garages the tenant can’t use.

Two rules that stop an inspection early

SNRHA’s checklist says the inspector will not complete the inspection if:

  1. The utilities aren’t on, or
  2. More than 8 violations are found.

In either case the unit is marked “not ready.” SNRHA also says it expects the unit to be move-in ready and won’t hand the owner a punch list. A unit that isn’t ready the first time is the most common reason the process drags.

What happens if a unit fails

The owner receives a notice listing what has to be fixed and by when. Under SNRHA’s abatement policy:

  • A request to extend the re-inspection date must reach SNRHA within 7 calendar days of the Notice of Default, by mail, email, or fax to (702) 477-3453.
  • For an existing tenancy, if repairs aren’t made by the deadline, SNRHA acts within 5 business days. That can mean scheduling an inspection, issuing the tenant a voucher and moving packet, and cancelling the HAP contract.

If you’re a voucher holder and a unit you want fails, ask the landlord directly whether they plan to make the repairs and when. A landlord who already works with SNRHA and keeps units inspection-ready saves you weeks. Meanwhile, keep an eye on your voucher’s expiration date. The search clock pauses while SNRHA reviews your Request for Tenancy Approval, but the date on your voucher still matters.

Questions to ask a landlord before you apply

  1. Have your units passed SNRHA inspections recently?
  2. Are the smoke and carbon monoxide alarms working right now?
  3. Will the utilities be on for the inspection?
  4. Who schedules repairs if the inspector finds something?
  5. Do you charge voucher holders an application fee?

Where we fit

Both Vegas Value Living properties accept Housing Choice Vouchers and HUD-VASH, and voucher holders pay no application fee. We are experienced with SNRHA’s HAP contracts and HQS inspections. See Section 8 housing at our Las Vegas apartments, or walk through the full Section 8 approval process from RTA to keys.

For SNRHA’s current forms, including the checklist itself, visit snvrha.org or call (702) 477-3100.